Photo Page 2

This page last modified on , June 1 , 2008

License process started July 31 2007

Rebuild 4/08
Finished Dash

License process completed Aug 7 2007

BugE with 3.00 X 16 rear tire

Custom Digital Speedometer

6/1/08
added electric actuator

6/1/08   New fairing hinge point left and right side

6/1/08   New fairing attachment point left and right side brackets welded to inner frame. Fairing is no longer supported from front axle

6/1/08   Rear wheel with fairing support arm

6/1/08   Electric actuator arm attachment pull pin
for quick disconnect

6/1/08
Electric actuator and crunch pad.
This assembly holds fairing tight and rigid

aaaaaaaaaaaaiii